This project is the extension of Corporate Drive from Railroad Street to west of Huffines Boulevard and started on February 13, 2024. The estimated length of construction is 2 ½ years. The project includes some new public utilities, a roughly 2,000 linear feet bridge across the Elm Fork of the Trinity River, street lighting, 12’ multipurpose trail and sidewalks with the new pavement.

Project Description:

The scope of work for Corporate Drive Segments 2 and 3 project includes:

  • new construction of a 4-lane divided concrete roadway
  • roughly 2,000 linear feet of bridge over the Elm Fork of the Trinity River
  • install new 12” water line from Railroad to Huffines Boulevard
  • install new storm drainage lines along the roadway
  • build approximately 1.5 miles of 12’ multipurpose trail and sidewalks
  • install street lighting along the roadway

Project Cost:

  • $43,039,500

Estimated Completion Date:

August 17, 2026